BuyLinkBuilding
BuyLinkBuildingSign up

Procurement sheet

Link building vendor comparison: a scorecard for the RFP

Three quotes arrive in three formats. This sheet puts them on one scale so the person who signs can see why the winner won.

How to use it

Score every vendor on the same ten rows

Give each criterion 0 to 3, multiply by the weight, and add up. Do it before the pricing envelope is opened, if your process allows. Price is only one row of ten.

  • Weights below are a starting point, change them to fit your client
  • A 0 on any must-have row ends the comparison
  • Keep the filled sheet with the contract file

The ten rows and their weights

Weights are our suggestion for a first RFP, not an industry standard.
CriterionWeightA clean answer sounds like
Site list disclosed before payment5Domain, metrics and niche shown per placement
Price per unit stated4A number per link, with the scaling rule
Approval point before charge4A basket or quote you can forward
Link attributes stated3Dofollow, permanent, one link per article
Content control3Automatic, own instructions or own article
Delivery window3A stated time after payment, such as about 24 hours
Proof of delivery4Live URLs you can open, with a status
Documents2Invoices and proforma invoices
Contract length2None, or one you can leave
Claims about rankings5There are none

Reading the weak answers

Vague replies are data. A vendor who says the network is proprietary has told you that you cannot audit it, and you can score that as a 0 without further discussion.

Ask for one live example per row and open it yourself. Nobody can check a screenshot of a report, but anyone can load a URL in a private window and look for the anchor, the rel attributes and the page around it.

Check that the quoted metrics come from a tool you know, such as Ahrefs, Semrush, Moz or Majestic, and say which one. Domain Rating, Domain Authority and Trust Flow are three different numbers from three vendors, and mixing them in one quote is a common way to flatter a site list.

Finally, ask what happens when a placement is queried. We cannot speak for others, but with us the answer starts at your account page with the order and URL in hand.

Documents to request from every bidder

  • A sample of the ordering screen or the quote format
  • The metric source and the date it was last refreshed
  • Written scope: link count, anchor policy, content mode
  • Stated delivery time and what counts as delivered
  • How invoices are issued, and whether proforma ones exist
  • What the vendor will not do, in writing

A worked example, clearly hypothetical

Invented scores for three imaginary suppliers. Not a market survey.
SupplierRaw score /30Weighted /105Decision
Supplier A (retainer agency)1963Strong report, hidden site list
Supplier B (freelancer)1758Cheap, no proof of delivery
Supplier C (marketplace)2584Disclosed rows, basket review

Scoring questions from the evaluation panel

Should price carry more weight than ten percent?
Possibly. We gave it four points of a 35-point weight total in this template, which is roughly eleven percent. A client with a rigid ceiling can double it, but then the proof rows should keep their weight.
Do we need three bidders?
Three is a convention, not a rule. Two bidders still give you a comparison, and one gives you a benchmark only. Say which in the file.

The example is made up to show arithmetic and nothing else. Your suppliers will score differently, and a retainer may well win where you need strategy as well as placements.

Where you do want only placements, our spending memo explains how to size the order, and the glossary translates the jargon that tends to appear in quotes.